- This event has passed.
Assabet River Trail Bridge Construction Day 3
May 21, 2017 @ 9:30 AM - 3:00 PM
Come join us for the construction of a new trail bridge on the Assabet River trail.
The 20′ bridge spans a small creek.
Start time is 9:30 Items to accomplish.
-
- Finish the railings on the bridge
- Clear far trail of small trees and brush
- Dig and level sill and stringers for attached boardwalk
- Install hangers and stringers on boardwalk to sill
- Deck boardwalk (ramp) to the bridge.
- Level boardwalk to the trail
Let me know if you can come.
Bring Water, bug repellent and work gloves, a battery powered hand drill if you have one. (long pants only please)