Loading Events

« All Events

  • This event has passed.

Assabet River Trail Bridge Construction Day 3

May 21, 2017 @ 9:30 AM - 3:00 PM

Come join us for the construction of a new trail bridge on the Assabet River trail.
The 20′ bridge spans a small creek.

Start time is 9:30 Items to accomplish.

    1. Finish the railings on the bridge
    2. Clear far trail of small trees and brush
    3. Dig and level sill and stringers for attached boardwalk
    4. Install hangers and stringers on boardwalk to sill
    5. Deck boardwalk (ramp) to the bridge.
    6. Level boardwalk to the trail


Let me know if you can come.

Bring Water, bug repellent and work gloves, a battery powered hand drill if you have one. (long pants only please)

Details

Date:
May 21, 2017
Time:
9:30 AM - 3:00 PM

Organizer

Bruce Rachman
Phone:
978-505-9714
Email:
rachman0015@comcast.net

Venue

Assabet River Trail Bridge
Acton Waste Water Treatment Plant on Adams Street
Acton, MA 01720 United States
+ Google Map
Phone:
978-505-9714